24-hunter-st-parramatta-DR_0392-D

Completed for AP Investments  Bordercorp in 2009, the project was delivered via a design and construction, to assist with the project feasibility the structure was changed a rapid wall and floor construction to expedite the program and show some cost savings. The site contained a 7 metre frontage with 3 level car stacker basement. 5 Level commercial building with composite stainless steel facade and terracotta tiles, over 1900 sq of leasing space with building management system and lifts. Total Cost $ 2,900,000 Architect Hosking Munro http://www.hoskingmunro.com.au/

24-hunter-st-parramatta-DR_0409-D24-hunter-st-parramatta-DR_0389-D